LDA increases cost of structure of Park and Ride Plaza to Rs837 million

Downtown Mall Gulberg Lahore
Downtown Mall
Goldcrest Mall & Residency DHA Phase 4 Lahore
DHA Goldcrest Mall
DHA PentaSquare Phase 5 Lahore Render
DHA Penta Square
DHA Raya
DHA Haly Tower Corporate Offices Shops
DHA Haly Tower

LAHORE: The Lahore Development Authority (LDA) is seeking more funds for constructions at Liberty’s Park and Ride Plaza. For the second time it has sent over a proposal to the Communications and Works Department for its comments, The Express Tribune has learnt.

The decision was made on Tuesday in the general body meeting of the LDA under the chair of DCO Ahad Khan Cheema along with LDA director general Abdul Jabbar Shaheen.

LDA officials would not talk about it but the matter was the top agenda items for the meeting. The cost of the plaza has now increased on account of the recommendation of the Traffic Engineering and Transport Planning Agency (TEPA), the agency responsible for the execution of the project.Chief Minister (CM) Shahbaz Sharif originally approved the Park and Ride Plaza at Bank Alfalah Square for Rs499.919 million in July 2009. The plaza, at that time, was planned as a five-storey building with the basement, ground floor and first floor to be used for commercial purpose. The car parking capacity was for 206 cars. The operational cost of the plaza for nine years was estimated at around Rs39 million while the net income during the same span of time was estimated at Rs1.4 billion, plus Rs1.76 million which were to be raised from the auction of the shops.

Later, the CM directed the LDA to revise the plan and make the plaza a 9-storey structure with a total of 11 floors, three commercial floors (lower ground, ground and mezzanine), eight parking floors with capacity for 305 cars and 150 motorbikes. Restaurants on the first and top floors were added as were 81 shops. The LDA approved the revision which increased the cost to Rs677.457 million.

Sharif on November 9, 2010, suggested that the restaurant at the top have full back up of power generators during load shedding hours. TEPA then revised the second plan accordingly and estimated the cost at Rs837.932 million, an increase of Rs160.475 million. The LDA approved the revision and the price will be charged to the authority.
In the new plan, architectural work is billed at Rs74,581,120, public health at Rs15,761,653, electric work at Rs179,035,061 and the HVAC system at Rs46,187,000.

Light metalware cost was revised to Rs117,855,830, lift (panoramic capsule elevator) to Rs13,600,000, horticulture and landscaping to Rs10,794,620, rehabilitation of existing parking area to Rs2,843,596 and street lights to Rs1,220,890. Operational charges for the first year have been revised to Rs23,814,000, gas connection at Rs500,000 along with additional percentage on all above charges has been revised up to 4.5 per cent. The revised cost for the entire project now stands at Rs91,571,885, previously it was at Rs 89,851,087.

DHA Lahore
DHA Lahore
DHA Peshawar
DHA Peshawar
DHA Quetta
DHA Quetta
DHA Multan Logo
DHA Multan
DHA Gujranwala Logo
DHA Gujranwala
DHA Bahawalpur
DHA Bahawalpur

Property Buying & Selling was never easy before, simply connect with our WhatsApp Hotline for absolutely free property consultancy. Please save this number +923111042111 in your contact list to get regular updates from us, otherwise you will not receive any update.

Subscribe to our YouTube Channel for latest videos abuout Pakistan Property including DHA Lahore, Peshawar, Quetta, Multan, Gujranwala & Bahawalpur. Also Naval Anchorage Gwadar, New Tonw, Sangar, BECHS, FTBA, Creek City, Golden Palm, GDA 5, Muscat Center and many other projects in Pakistan.

Join eProperty Telegram Groups for Latest DHA Files Rate and News Update
LDA increases cost of structure of Park and Ride Plaza to Rs837 million
Scroll to top